Installation, Commissioning & Maintenance
Installation Instructions
Three separate stages are involved:
- Installation of the Power Control Unit
- Connecting Cables/Junction Box
- Anode/Cofferdam/Flange
1. Power Control Unit
The control panel should be located as near as possible to an AC power supply
and the anode locations (to minimize the DC cable length and voltage drop).
The control panel location should meet the following requirements:
- Maximum ambient temperature of 50° C (unit rated to 55° C)
- Adequate space around unit to ensure proper ventilation
- Mounted at head height (max) to facilitate reading and output adjustment or
servicing
- Easily accessible location
- Safe, non-hazardous environment
- Bulkhead mounted and/or secured to a suitable base
2. Cable Connections: Power Control Unit, Junction Box, Anodes
Input AC cable connection points and earthing cable connections are clearly
marked in the power control unit.
Similarly positive output terminals on each module are evident with a common
negative cable connection. Cable sizing and specification for AC input and
DC output are described here.
The DC supply cable to the anodes should be connected to the intermediate
junction box.
A junction box is provided with shrouded gland (DC) Inputs and anode/sea chest
output connections.
Anode cables and negative return should be connected to the DC supply in the
Junction Box.
3. Anode, Cofferdam, Flange
Anodes should be installed in the position specifically shown or advised for
each vessel.
The anodes are installed in the selected compartments, namely sea chests, or
injection strainers.
 |
|
 |
|
Looking up from sea chest through aperture.
Notice aperture diameter is slightly (5-10mm) larger than inside diameter
of mounting ring (shown). This disparity allows room for a weld bead
securing the underside of mounting ring to sea chest that does not interfere with
the insertion of the anode through the aperture. |
|
Looking down at mounting ring through aperture and into the
sea chest. |
- The agreed positions for the 135-140mm apertures for the cofferdam entry points
should be marked and burnt/cut out. Take precautions to protect surrounding
equipment with heat resistant blankets etc. A standby fire extinguisher should
be provided.
- The mating flange to receive the anode and cofferdam flange should be
welded in position with welding on both inside and outside joints.
- All weld scale should be removed and any damaged paintwork reinstated.
- The anode cofferdam screw cap should be removed and the anode cable
disconnected. Remove the compression gland and screw the anode cap back onto the
cofferdam. Hand tighten only.
Carefully lift the anode/cofferdam/flange assembly by means of the eyebolts
provided and lower the anode onto the sea chest or strainer mating flange,
making sure that the rubber gasket is in position. Evenly tighten down the anode
flange bolts.
(THIS PROCESS IS REPEATED FOR ALL ANODES)
Note: All threaded sections of nuts, bolts and the cofferdam lid,
including the anode connection, must be lightly coated with WWI Marine Guard.
- After installing the anode assembly, feed back the anode cable and
compression gland.
Reconnect the anode cable to the anode bolt.
Replace the cofferdam cap, securing tightly onto the uppermost O-ring. Finally
tighten the cable compression gland and fit the gland shroud.
- Secure anode cables and take back for
connection in the junction box.
- When vessel is afloat, carryout leakage tests by checking for ingress of
water into the cofferdam.
 |
|
 |
|
Looking up from sea chest at installed
anode. |
|
Looking down at completed assembly. |
4. Commissioning
Note: Only to be carried out when the vessel is afloat.
- Check all cable connections at power control unit, terminal box and anodes.
- Identify each positive output and relevant anode, and record the same.
- Switch on AC supply and then the panel on/off switch.
- Switch on all power supplies then switch on Remote Administration Display
(RAD).
- Record all status messages and record all system readings.
5. Maintenance
Maintenance requirements are minimal. The system operates at constant
current output and therefore does not require adjustment. A weekly recording of
current outputs on each anode is recommended (a log sheet is provided).
This provides a record of the system's operation, an indication of any changes
in function, and a reminder when anode replacements are scheduled.
A complete loss of current on any anode should be investigated by checking all
cable connections and power panel fuses.